The Ugly Truth About Infrastructure Funding
Please take time to view a short video “The Ugly Truth”. Clever artistry and specific points provide a clear outline of Washington’s infrastructure needs and the disappearing funding.
Please take time to view a short video “The Ugly Truth”. Clever artistry and specific points provide a clear outline of Washington’s infrastructure needs and the disappearing funding.
A 32.4 kW, 150 panel, solar energy system was installed in the fall of 2013 on the Valley View Sewer District/Water District # 125 joint administration building located at 3460 S 148th St. Installer: Sunergy Systems Installation Cost 90% recovered by 2020 Provides 15% of yearly electricity consumption for the site (Three buildings) A 9.6 […]